1·A safe gird (6) for operation is arranged on the upper beam (2).
作业用安全栏(6)设置于上梁(2)。
2·For hydraulic pressure, the flexible modules were defined and the products family table was designed. Taking the upper beam module as an example, the...
在对液压机进行柔性模块划分和产品族规划的基础上,以上梁模块为例说明了产品快速设计的方法和过程。
3·For hydraulic pressure, the flexible modules were defined and the products family table was designed. Taking the upper beam module as an example, the des...
在对液压机进行柔性模块划分和产品族规划的基础上,以上梁模块为例说明了产品快速设计的方法和过程。
4·An ejector rod and a female die are fixed at the lower part of the upper beam, and a mold core is mounted on the lower beam. The end of the mold core has at least one shoulder.
于上架梁的下方固定有顶杆和凹模,于下架梁上安装有其一端部至少有一个肩凸的型芯。
5·The formulation for element stiffness matrixs, and vectors of nodal of element with the upper beam element subjected to either vertical concentrated load or distributed loads is illustrated.
阐明了单元刚度矩阵以及在上层梁单元作用竖向集中荷载或分布荷载下单元节点荷载列阵的形成。
6·For hydraulic pressure, the flexible modules were defined and the products family table was designed. Taking the upper beam module as an example, the design method and process were explained.
在对液压机进行柔性模块划分和产品族规划的基础上,以上梁模块为例说明了产品快速设计的方法和过程。
7·During the construction of section steel column and concrete filled steel tube column, the inclined column space positioning may be inaccurate and affects the upper beam and column positioning.
型钢柱、钢管混凝土柱施工时容易造成斜柱空间定位不准确,影响上部梁柱定位。
8·This beam bears the whole weight of the upper floor.
这根大梁承受了上面那一层的全部重量。
9·This beam bears the whole weight of the upper floor.
这根大梁承受了上面那一层的全部重量。 。
10·Therefore, the upper bridge with simply supported continuous beam structure more and more.
因此,桥梁上部采用先简支后连续梁结构越来越多。